Process

Six stages, in order

Nothing on this list can be skipped or resequenced. Each stage ends in a document you keep, which is what makes the next stage checkable.

01

Site visit & soil

We walk the plot, check access, levels, the water table and neighbouring structures, and order a bearing capacity test where the foundation calls for one.

→ Site report + soil test
02

Drawings

Plans, elevations and the structural set, coordinated with Vaastu requirements where the family follows them, and revised until you sign off.

→ Approved drawing set
03

Estimate & agreement

A line-by-line bill of quantities against the approved drawings, a fixed specification, a payment schedule tied to stages, and a written agreement.

→ BOQ + signed agreement
04

Foundation to plinth

Excavation, footing, column starters, plinth beam and backfill. Concrete cubes cast and sent for seven and twenty-eight day testing.

→ Plinth level certified
05

Superstructure

Columns, beams and slabs floor by floor, then masonry and plaster. Photographs of reinforcement go to you before every pour, not after.

→ Structure complete
06

Finishes & handover

Electrical, plumbing, flooring, joinery and painting, then a joint snag list, clearance of every item on it, and handover with the as-built set and warranties.

→ Keys + as-built set

Specification

Published, not negotiated on site

The grade of every material we build with, in writing, before you sign. If another quote is cheaper, this table is where the difference will be.

Standard specification — residential turnkey, Package A. Upgrades priced on request.
ElementSpecificationStandard
FoundationIsolated / raft footing to soil reportIS 1904
ConcreteM20 for footings, columns, beams and slabsIS 456:2000
ReinforcementFe 500D or FE 550D TMT, ISI markedIS 1786
CementOPC 53 grade structure · PPC masonryIS 269 / IS 1489
MasonryAAC blocks 200 mm external · 100 mm internalIS 2185
PlasterExternal 15 mm double coat · internal 12 mm1:5 / 1:6 CM
WaterproofingCrystalline to sunk slabs, terrace & basement10 yr warranty
ElectricalFR copper wiring in concealed PVC conduitIS 694
PlumbingCPVC supply · PVC drainage, concealedIS 15778
DoorsTeak frame, main door teak, internals flush—
WindowsUPVC sliding with mosquito mesh & grill—
Flooring800×800 vitrified · anti-skid in wet areas—
PaintingInterior emulsion · exterior weather coat2 coats + primer
TestingConcrete cubes at 7 and 28 days, third partyIS 516

Free site visit & estimate

Compare this against any other quote

Take this table to whoever else has quoted you and ask them to fill in the same rows. That comparison is worth more than a headline rate.